Nisqually River (WA) - April 15, 2018

Please be patient while the pictures load...

Annual spring Nisqually warmup with Jim. Next Saturday 4/21 will be the first organized Nisqually River Cleanup


Chained platform


Lunch stop at the Weeping Wall. We were wondering what was behind us.
Interestingly, the official JBLM boundary does not make it to the Nisqually River segment we run, but there is this curious "Mock City" area


Verification photo. Thanks Jim2


Flow closeup


Lots of flow locations


Full vertical flow height


Above the easy Class III


Warning above takeout


Yelm hydroelectric plant


USGS Flow at 04/15/2018 12:00 PDT 2,780 CFS 3.71'


    Credits:
  1. U.O.N., Olympus Stylus 770SW Digital Photography by William F. Smith (7.1 MP, 3072x2304 HQ, 3X optical 38-114mm)
  2. Olympus Stylus 725SW Digital Photography by Jim McCool (7.1 MP, 3X optical 38-114mm)

Last Update 17-Apr-18